This is the Columbia St. home with the second (brown) coat of stucco complete. This coat needs to cure for 7 days before application of acrylic finish coat. Sheetrock has begun inside. Come see us at the Green and Solar Tour of Homes on October 11, 12 2008. This home will be featured under construction. We will be there to answer questions and provide an overview of high performance features utilized.
This is a pond we are installing in Sisters Oregon. The pond is waterproofed with a 36 mil poly liner factory sealed to prevent leakage. We will now install filter fabric over the top to help prevent punctures in areas where dogs and deer will go to the water to drink.
This image shows the application of lathe and waterproofing under stucco application. This home is going to receive traditional three layer stucco consisting of scratch, brown, and finish coats. The final coat will be 100% acrylic.