visit us on the web at www.dueybrothers.com

Dec 5, 2008

Here is the Columbia St. custom home with exterior siding and paint complete. Interior finish work is progressing with completion scheduled for mid-january

solar




These pictures show the installation of evacuated tube solar panel racks. This solar setup will provide heat for radiant floors as well as domestic hot water.

Oct 31, 2008

Sisters, Oregon Remodel

Here is the view from the great room in our remodel in Sisters Oregon. The tour of Remodeled Homes proved to be very successful. We had a great turnout and took home two awards. The home won "Best Feature" for the 12 foot jeld wen folding door letting the "outside in". We also won "Best Green Feature" for incorporating reclaimed wood trim, cork flooring, recycling, and donating building materials and appliances to Habitat For Humanity.

Oct 21, 2008

Tour of Remodeled Homes



Come see our project at the 2008 COBA Tour of Remodeled Homes. The home is located at 67655 Peterson Burn Rd, Sisters, OR 97759. This project is a whole house renovation where all existing interior walls and finishes were removed. 1000 square feet of living space was added and staircase relocated. The home has been finished in a modern-rustic theme incorporating reclaimed wood, no VOC paint, black walnut floors, and fine craftsmanship throughout.
We will be there from 11-6 Saturday October 25 and October 26, 2008.
For more info call or email Trevin Duey from the contact page of our website.
Directions:
From Sisters take Hwy 242 West
Left on Edgington Rd. for about 2 miles (just past the elk farm)
Left on Peterson Burn Rd. Follow the signs 3 miles to the end.

Oct 9, 2008


This is the front view of our 4000 sq. ft. remodel at Sisters, Oregon. We have fully renovated this custom home by taking out all interior walls, relocating the staircase, and adding a dormer. We have installed beautiful walnut, cork, and tile flooring throughout the downstairs. We have utilized reclaimed lumber to trim several areas in the living space. No VOC paint has been used on all of the walls. Come see us at the Tour of Remodeled homes on October 25 and 26, 2008. For more info see www.coba.org or call Trevin at (541)815-0404.

Sep 26, 2008

824 NW Columbia St. Progress

This is the Columbia St. home with the second (brown) coat of stucco complete. This coat needs to cure for 7 days before application of acrylic finish coat. Sheetrock has begun inside. Come see us at the Green and Solar Tour of Homes on October 11, 12 2008. This home will be featured under construction. We will be there to answer questions and provide an overview of high performance features utilized.

Sep 23, 2008

Sisters Remodel Pond

This is a pond we are installing in Sisters Oregon. The pond is waterproofed with a 36 mil poly liner factory sealed to prevent leakage. We will now install filter fabric over the top to help prevent punctures in areas where dogs and deer will go to the water to drink.